Most of our work happens inside somebody else's running plant, on a window that cannot move. These are three that show the range.
Material HandlingCement Plant Conveyor Replacement
Replaced 900 feet of clinker conveyor and a 140 foot bucket elevator during a 16 day outage, including all structural supports and chute work. Back online eleven hours early.
Machinery Moving800-Ton Press Relocation
Disassembled, transported, and re-set an 800 ton stamping press across two states, including new pit work, grouting, and alignment to 0.002 in across the bolster.
Structural SteelMezzanine and Pipe Rack Erection
Fabricated and erected 22,000 square feet of mezzanine and 600 feet of pipe rack over an operating line, working nights so production never stopped.
1240
Equipment installations
48
Plants served
140
Craft employees
0.71
EMR safety rating
Tell us what needs to move
Send the equipment list, the building, and your window. We will walk it and come back with a real number and a real date.