Robotic Weld Cell Conversion

Planter toolbar weldment moved from manual to robotic
Orange robotic welding arm welding a steel assembly inside a fenced cell

A 14 foot planter toolbar with 62 welds was taking two welders most of a shift. We built dedicated fixturing, moved it into a two-station robotic cell, and brought cycle time from 5.5 hours to 70 minutes with first-pass weld acceptance above 99 percent.

Cycle time
70 min
First-pass welds
99.2%
Capacity
4x

Laser Nesting for a Boom Program

Plate utilization and cut quality on 3/4 in steel
Fiber laser cutting thick steel plate with sparks under the head

A construction OEM was buying plasma-cut boom plates and machining the bevels afterwards. Moving the family to our 12 kW fiber laser with common-line nesting removed the secondary op entirely and lifted plate utilization from 71 to 86 percent.

Plate utilization
86%
Removed
1 op
Part cost down
18%

Formed Panel Tolerance Recovery

Long panels that finally fit the first time
Operator bending a long steel panel on a CNC press brake

Twelve foot side panels were arriving at the customer out of flat and needing rework at the line. We added crowning compensation and angle measurement on the press brake and held the flange within 0.5 degrees over the full length.

Flange angle held
0.5°
Line rework
0
To resolve
3 wks

Complete Hydraulic Subassembly

Frame to plumbed module, shipped line-ready
Technicians installing hydraulic hoses on a yellow machine subassembly

We took over a frame, tank, and valve subassembly that the OEM had been building in house. It now ships painted, plumbed, pressure tested, and sequenced to their line, freeing 6,000 square feet of their assembly floor.

Pressure tested
100%
Sequenced delivery
JIT
Freed for OEM
6k sq ft
3.2k Active part numbers
97.8% On-time delivery
180k Square feet under roof
210 People on two shifts
Welder in an auto-darkening helmet MIG welding a heavy steel bracket

Manufacturing and Production

One Purchase Order. One Supplier. Every Process.

Most of our customers came to us with a part moving between four vendors and a week of freight in between. We pulled it under one roof, cut the lead time in half, and took the finger-pointing out of the corrective actions.

Request a Quote