Stamping plant, Findlay, OH
2.4 MW Rooftop Array
Installed across 11 acres of roof in four phases around a three-shift schedule, with the structural review done before the first panel went up.
- 31%
- of annual kWh
- 6.2 yr
- simple payback
- 0
- production hours lost